
$ 375.20 EA
Company wide:
0
in stock
Documents & Guides
MLB U4544-XL GENERAL ENCLOSURES 23054, ****Customer must confirm local utility or metering/power distribution approval for the metering and power distribution equipment prior to installation. Seller makes no warranty of utility acceptance.****
Overview
MLB U4544-XL GENERAL ENCLOSURES 23054, ****Customer must confirm local utility or metering/power distribution approval for the metering and power distribution equipment prior to installation. Seller makes no warranty of utility acceptance.****
Also known as: 784572230545, U4544-XL, MLBU4544XL
Specifications
| Standards: | California Proposition 65 |
| Standards: | California Proposition 65 |